jesuitchennaimission.orgsitemap
jesuitchennaimission.orgsitemap
jesuitchennaimission.orgsitemap
jesuitchennaimission.orgsitemap
mail-icon

cm.office@mdusj.org

mail-icon

91-44-28178422

mail-icon

91-44-28178411

YouTube-icon YouTube-icon

Infrastructure 2006-2007

1. Number of Courses Conducted : 07

a. No. of Courses Offered Under TNOU : 01

1. Refrigeration & Air – conditioning Technician

b. No. of Courses Offered Under SCVT : 07

1. Automobile Mechanic
2. Electrical Technician
3. Mechanic General Electronics
4. Mechanic Refrigeration Air Conditioning And Central Plant
5. Data Entry Operator
6. Two & Three Wheeler Mechanism
7. Welding Technician

2. Students Strength : 165

 

students1

1. Refrigeration & Air – conditioning – 45
2. DTP Operator – 22
3. House Electrician – 24
4. General Electronics – 15
5. Four Wheeler Mechanism – 25
6. Two & Three Wheeler Mechanism – 12
7. Welding Technician – 22

3. Total Students Strength from the
Year of establishment : 615 (32+78+167+173 + 165)

students5

 

4. Infrastructure facilities available :

a. Land : 15 acres

lccprac9

b. Building :

1. 8 Class Rooms : (each 20’x16.8")
2. Hall : 77’x26’x6"
3. Library : (20’x8′)
4. Director’s Room : (20′ x 15’9")
5. Office Room with a Computer : (20′ x19’3")
6. 2 Store / Record Rooms : (each 12′ 3" x 9’4")
7. Staff Room : (20′ x 15′)
8. St.Mary’s Hall : (77.6×27.3)
9. Toilets : 09 Numbers

c) Lab :

lccprac14

1. Refrigeration & A/C Lab : (30’x25′)
2. House Electrician Lab : (31’6"x30′)
3. General Electronics Lab : (31’x 20′)
4. Four Wheeler Mechanism Lab : (37’x30′)
5. Two & Three Wheeler
Mechanism Lab : (31’6"x30′)
6. Welding Lab : (30’x20′)
d) Computer Lab with 30 Computers : (20.75’x20′)

All Labs with equipments as per the norm of the Department of Employment and Training (DET).

State Council of Vocation Training (SCVT)

History of the School

Infra Structure

Vision of the Mission

Our Family Links